研发埠

标题: 【2】Actran是否具有ISO-9001或者类似的质量认证体系? [打印本页]

作者: 张吉健    时间: 2015-7-13 10:17
标题: 【2】Actran是否具有ISO-9001或者类似的质量认证体系?
本帖最后由 张吉健 于 2015-7-13 10:54 编辑

Q: Actran是否具有ISO-9001或者类似的质量认证体系?


A: Actran具备基于大量测试算例与工程应用案例的质量保证体系,可以有效保障Actran所有软件计算特征的质量。各种测试案例都在不间断的反复运行中,我们可以实时检测到存在的隐患并及时排除。同时,对于新版本开发引发的新老问题,我们通过修改源代码排故。
Actran的质量保证体系概要如下:
The primary goal of the QA procedure is to test the current state of our products
on all supported platforms in order to:[size=10.0000pt]
     ·
detect:
                         any problem building the binaries
                         any regression in correcteness
[size=10.0000pt]· test:
                         the product-lines built during QA procedure
                         the new functionality introduced in recent development[size=10.0000pt]
     ·
track:
                         performance improvment/regression
                         eventual behavior difference
The QA procedure consists of[size=10.0000pt]
     ·
checking out all modifications on the internal projects starting from 18h00
[size=10.0000pt]     · recompiling all libraries and executables from scratch
     ·
generating all product-lines from scratch [size=10.0000pt]
     ·
using these product-lines to run the QA
                         on monday,tuesday,wednesday and thursday night, all non-HPC  tests are run (nightly)
                             with the exception of biot which only starts the nightly on monday and wednesday
                         during the weekend all tests will be run[size=10.0000pt]
     ·
collecting the results of the QA and generate a report [size=10.0000pt]
     ·
These reports contain:
                         a basic definition of our release platform
                         an overview of the procedure with, for each product-lines, an indication of the number of
                              failed test and the total number of scheduled tests
                         an expand view of theses tests with: [size=10.0000pt]
                        §
a boolean result, meaning its success or failure[size=10.0000pt]
                        §
when available a graph of the data which were used when comparing the results
                                               to the related reference.
                        [size=10.0000pt]§ an overview of the test it-self within a ppt document
                         an indication of the computation time and a time regression indicator
                         two different links to download:
                                          [size=10.0000pt]§ the product-lines built during QA procedure
                        
[size=10.0000pt]§ the same product-lines which entirely passed the QA procedure
                                                at a given time

                                               This procedure is executed at least on all release machines (i.e. every machine that
                                               serves to generate all product-lines for a specific supported platform) and on some
                                               additional machines that can serve as a valuable reference.





欢迎光临 研发埠 (http://bbs.yanfabu.com/) Powered by Discuz! X3.2